The Valley Spectrum
  • Login
  • Top Stories
  • J&K
  • National
  • International
  • Business
  • Editorial
  • Health
  • Sports
  • More
    • Entertainment
    • Technology
No Result
View All Result
  • Top Stories
  • J&K
  • National
  • International
  • Business
  • Editorial
  • Health
  • Sports
  • More
    • Entertainment
    • Technology
No Result
View All Result
The Valley Spectrum
No Result
View All Result

DC Bandipora reviews power supply scenario in Sumbal sub division, chairs grievances redressal camp

by VS Desk
December 16, 2021
in J&K
0
DC Bandipora reviews power supply scenario in Sumbal sub division, chairs grievances redressal camp
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

BANDIPORA: Deputy Commissioner Bandipora Dr Owais Ahmad on Wednesday visited Sumbal Sub Division to review the power Scenario in the Sub Division.

He was accompanied by Sub-Divisional Magistrate Dr Bashir Ahmad, Executive Engineer PDD, members of Panchayat Raj Institutions and other senior officers of the district.

Dr Owais inspected ongoing construction of 10MVA Receiving Station in Sumbal. The officers were informed about the status of work and informed that work is in its final stage. DC Bandipora work directed the officers to complete the finishing works so that the receiving station can be made functional, inaugurated and connected to the grid.

He said the receiving station will help to augment the power infrastructure and will reduce the load on the system thereby improving the power supply of the area.

Later the Deputy Commissioner also held a grievance redressal camp at Wangipora  Sumbal.

During the camp various public deputations from, Sumbal, Wangipor, Shadipora  and adjoining villages  including locals and PRI members flagged various issues of public interest besides raising several demands seeking early redressal of the grievances.

The issues raised by the deputations and individuals includes macadamization of left out of roads, up-gradation of Healthcare centres and Schools, Providing regular power and water supply to the villages, Estimation of pending RDD works etc.

The DC after listening to various public demands directed concerned officers to ensure prompt and speedy redressal of the issues raised during the camp.

He assured that all issues within his competence will be redressed as early as possible whereas the other all genuine demands will be taken up at appropriate forums for their resolution.

VS Desk

VS Desk

Next Post
Safeena Beigh chairs meeting at Uri, takes review of developmental works

Safeena Beigh chairs meeting at Uri, takes review of developmental works

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

Negligent Officials Will Not Be Spared:DC Kupwara

Negligent Officials Will Not Be Spared:DC Kupwara

2 years ago
It’s all over: Australia retains Ashes with win over England

It’s all over: Australia retains Ashes with win over England

2 years ago

Popular News

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Connect with us

  • About
  • Advertise
  • Careers
  • Contact
Call us: +1 234 JEG THEME

Copyright © 2021 The Valley Spectrum. The Valley Spectrum not responsible for the content of external sites.

No Result
View All Result
  • Top Stories
  • J&K
  • National
  • International
  • Business
  • Editorial
  • Health
  • Sports
  • More
    • Entertainment
    • Technology

Copyright © 2021 The Valley Spectrum. The Valley Spectrum not responsible for the content of external sites.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In